Planning Permission Secured for a Bespoke Storage facility following the redevelopment of an old truck and bus repair shop.
- Location:
- Andoverfords
- Service:
- Planning Appeals
Project Overview:
Planning permission was successfully negotiated for the redevelopment of a dated industrial building into a bespoke storage facility. Edge Design Workshop collaborated with Evans Jones to guide the applicant through the planning process.
The project involved a combination of refurbishment and modular new build to optimise the site for the storage facility.
Evans Jones planning team addressed objections from the highway authority by preparing a comprehensive planning statement. This case study highlights the importance of collaboration, innovative design, and effective communication in achieving consent for the viable re-use and redevelopment of the former industrial building.
The Results:
The collaboration between the client, Edge Design Workshop, and Evans Jones Ltd resulted in:
- Maximising Storage Space: The use of modular buildings allowed for a flexible and expansive storage facility.
- The planning and supplementary statements addressed concerns, gaining approval for the development.
- Sustainable Adaptive Reuse: Repurposing the building and incorporating a modular system-based solution minimising waste and environmental impact.